Singapore Changi Airport T2

Building Type: Airport Terminal 2
Completion: 1990

Terminal 2 opened on 22 November 1990 as part of Phase II in the original airport master plan. Deploying a linear configuration parallel to the runways, it is located adjacent to Terminal 1 towards the south, and heralded
the opening of the original skytrain system linking the two terminals via the landside.